The wellhead installation standardization process
13-3/8 "casing head installation 1. 17-1/2 "drill bit drilling into the design well, pulling out the drilling tool, and then entering 13-3/8" surface casing to predetermined position, cementing. 2. Cut the 20 "catheter, then lift the upper portion of the catheter, with a height difference of 510mm from the 20" catheter, and the line with a rough cut of 13-3/8 ". 3. Remove the broken casing. 4. After measuring the height of the catheter, it should be cut with the height difference of 505mm from the catheter, and then cut 13-3/8 ". 5. Check the original horizontal condition of 13-3/8 with the horizontal ruler, if not, cut the higher part to the level. 6. Use gas cutting method to cut out the - end of the 3/8 "casing preliminary groove, groove in the wheel again into a 10 * 30 °, and asking for groove edges and a smooth feel. 7. The sealing parts of the surface outside casing string and with emery cloth "BT" seal ring wil...